Doğuhan Enerji at 30: 2,354 MW across 72 completed projects

Doğuhan Enerji began its journey in 1993 with industrial structures and factory construction, and carried that expertise into renewable energy through a strategic decision taken in 1996. In the 30 years since laying the foundations of Türkiye’s first Wind Power Plant, the company has grown into a main civil works contractor delivering the heavy construction scope of wind projects across the country.

72 projects and 2,354 MW across Türkiye

The completed portfolio today stands at 72 power plants in Türkiye with a combined installed capacity of 2,354 MW. Site operations have been carried out in 22 provinces — among them İzmir, Balıkesir, Manisa, Çanakkale, İstanbul, Bursa, Mersin, Kırşehir, Çankırı, Ordu, Trabzon, Bayburt, Elazığ, Konya, Malatya, Muğla, Aydın, Tekirdağ, Bilecik, Yalova, Karaman and Kayseri. Across these projects the company has built the foundations, crane platforms, access roads and cable infrastructure for more than 1,200 turbines.

A significant share of the portfolio consists of the sector’s largest investments: the 168 MW Geycek WPP in Kırşehir, the two Karaburun projects in İzmir at 148 MW and 129 MW, the 115 MW Soma plant on the Manisa–Balıkesir corridor and the 117.6 MW Göktepe plant in Yalova.

180.8 MW under execution and the first storage facility

Projects currently under execution total 180.8 MW. The largest is the 129.8 MW Göktepe Wind Power Plant delivered for Polat Enerji and Hitachi Energy, with a scope covering civil works, electrical works and substation construction. Three further projects in Karaman, Kayseri and İzmir account for an additional 51 MW of capacity.

In the 2025–2026 period the company added a new field to its portfolio with the 110 MWh Göktepe Battery Energy Storage System in Yalova. Battery container pedestals, power-trowelled industrial site concrete with surface hardeners and waterproof cable galleries were completed to the millimetric surface tolerances the technology requires.

Its own equipment fleet, full control on site

Behind the company’s site capability is its own equipment fleet: 12 ramming machines, 15 excavators, 2 compactors, 1 wheel loader, 1 grader and 2 water trucks, alongside two 80-tonne cranes, 4 telehandlers and 3 bobcats. Thermal cameras, drone site inspection and monitoring devices support operation and maintenance, while SCADA and CCTV systems bring automation and control works into scope.

This technical independence is the key factor in delivering projects on time and within budget. From geotechnical surveys to structural calculations, every stage is managed on engineering data, and the plan developed in the engineering office is executed on site without delays.

A management system certified to international standards

Doğuhan Enerji’s management system is certified to three international standards: ISO 9001:2015 for quality management, ISO 14001:2015 for environmental management and ISO 45001:2018 for occupational health and safety. The scope of the certificates is defined as “infrastructure, construction, electric and commitment works for power plants”.

Adopting the preservation of the natural environment and minimising environmental impact as core principles when building renewable energy facilities, the company maintains a working culture that eliminates risk at its source in line with its zero-accident target.